San Marcos Vent Desalination
San Marcos, CA
Owner: San Diego County Water Authority
Civil Engineer: RBF Consulting
Construction Completion: 2014
Project Delivery Method: Design Build
Project Description: An approximately 26′-8″ long x 23′-6″ tall, below-grade, reinforced cast-in-place concrete weir structure and valve vault. The existing 96″ diameter pipeline was required to remain in-service throughout the construction phase. High early-strength concrete and precast concrete elements were implemented to facilitate design requirements.